Call

Modules, racking & site clearance

Solar panels & renewable decommissioning

The first large wave of solar installations is reaching end of life, and most sites are discovering that panels are neither ordinary e-waste nor ordinary glass. A decommissioning is also never only panels: it is racking, inverters, cable, transformers and foundations.

Where it can go

Evaluated in order,
best outlet first

Each route below is assessed and ruled out before the next is considered. Disposal is what remains after that, not where the conversation starts.

01

Module resale and redeployment

Modules that still generate tested and resold into the secondary market. Worth checking first, because a working panel is worth considerably more than its materials.

02

Module recycling

Glass, aluminum frames, copper and silicon recovered through recyclers equipped for photovoltaic material.

03

Balance-of-system metals

Racking, cable, inverters and transformers separated and marketed as scrap grades.

04

Specialty handling

Components carrying regulated material handled under the correct profile rather than with general scrap.

05

Last resort

Permitted disposal for residual fractions, with recovery documented.

What KODA handles

Coordinated end to end

The outlet is chosen on the material's merits, not on what is convenient. Every option is weighed against what the stream actually is, what it is worth and what documentation it has to produce — and the reasoning is shown to you, not summarized.

  • Site inventory of modules, racking, cable and electrical equipment
  • Module testing and resale market placement
  • Photovoltaic recycler sourcing and downstream verification
  • Separate marketing of metals so scrap value is not bundled away
  • Decommissioning logistics, phasing and recovery documentation

Common in

Who generates this stream

Solar developers and asset owners, independent power producers, utilities, EPC contractors and landowners.

One stream is a complete engagementThis can be handled on its own, at one site, with no requirement to move anything else to KODA. It can also run as part of a full portfolio. The scope is yours to set and can change in either direction.

Questions

Solar panels & renewable decommissioning, in practice

Are solar panels hazardous waste?

It depends on the module chemistry and on testing, and the answer differs by state. Some modules test as hazardous and some do not, so the determination is made before anything is moved rather than assumed.

Is it worth testing modules for resale?

Usually, on any site of reasonable size. A functioning module carries far more value than its recovered materials, and testing is a small step relative to that difference.

Do you handle the whole site or only the panels?

Either. Most decommissioning work covers modules, racking, cable, inverters and transformers together, because the metals carry real value and are easy to lose in a bundled clearance price.

Start with the material,
not the invoice

Every engagement begins with a KODA Operational Review™ — a structured evaluation of your facility, materials, vendors and compliance requirements. Recommendations come from that data.