Call

01 · Waste management

Hazardous and
non-hazardous waste

Both halves of this are managed the same way, which is not how it usually works. The regulated streams get attention because the paperwork demands it, and the non-regulated ones quietly cost more every year because nobody has looked at them since the contract was signed.

What the work covers

From the point it is
generated to the final site

01

Stream profiling

Establishing what the material actually is, from process knowledge and analysis rather than from what the last profile said. The determination is the generator's to make, which is precisely why it should be made on data.

02

Containers and accumulation

The right container at the point of generation, labeled and dated, in an accumulation area that works the way your operation already moves. Most findings in this area are housekeeping rather than chemistry.

03

Manifesting and transport

Manifests prepared and tracked, transport scheduled, and DOT requirements met on the shipping side. Loads are followed to the receiving facility rather than assumed to have arrived.

04

Treatment, recovery or disposal

The outlet is chosen on what the material is and what can legitimately be done with it. Recovery and treatment are considered before disposal on every stream, including the regulated ones, where it is assumed too often that there is no choice.

05

Non-regulated streams, same standard

Non-hazardous industrial waste, process residuals, off-spec product and plant trash managed with the same documentation and the same review as the regulated side.

06

The record that is left behind

Signed manifests reconciled against what left the dock, a certificate of destruction where destruction was required, and profiles kept current rather than renewed in a hurry when a load is already on a truck.

What you end up holding

A file that answers
the question

The point of the documentation is the moment somebody asks where a drum went two years after it left. That answer should take a minute to produce, not an afternoon of phone calls, and it should come from your own records rather than from ours.

  • Signed manifests, reconciled against what was shipped
  • Certificates of destruction where destruction was required
  • Current profiles, reviewed before they expire
  • Receiving facility documentation, kept per site
  • Exception reports when a load is rejected or short-shipped
  • One file per site, in a format you can hand to an auditor

Questions

Asked most often

Does our liability end when the truck leaves?

No. Generator liability runs to the final disposition of the material, which is the single most important thing to understand about this work. It is also the reason the choice of outlet matters more than the price of the haul, and why a load is followed to where it was going rather than closed out at the gate.

Can you take one stream rather than the whole site?

Yes. One profile, one recurring pickup or one problem drum is a complete engagement. There is no condition attached about the rest of your material, and there is no point at which you are asked to move the rest of it.

We are not certain whether a stream is hazardous.

That is a normal place to start and a short piece of work to resolve. Profiling settles it from process knowledge and, where needed, analysis. Carrying an assumption either way is the expensive option: a non-hazardous stream managed as hazardous costs money every month, and the reverse costs more than money.

Related

Where this connects

Scope is yours to setThis can be taken on at one site, for one stream, or across a full portfolio. Starting small carries no condition about the rest, and scope can move in either direction afterwards.

Start with one stream

A single profile is enough to see how the work is done. Nothing about the rest of your site has to change for it.